The Budhigandaki Hydropower Project is a reservoir-based project located on the Budhigandaki River in Nepal. It was identified during the Gandaki Basin study in the late 1970s. A pre-feasibility study was completed in 1984. The ongoing feasibility study has recommended the construction of a 1,200 MW power station with a Full Supply Level (FSL) of 540 metres.
The project is located in Gorkha and Dhading districts of Nepal. The project site can be accessed via Benighat along the Prithvi Highway (Kathmandu–Pokhara section). Benighat is approximately 80 kilometres from Kathmandu. From Benighat, the dam site and powerhouse can be reached using the motorable bridge over the Trishuli River. Both sites are approximately 1.5 kilometres from the end of the road.
The dam site is located approximately 2 kilometres upstream from the confluence of the Budhigandaki and Trishuli rivers at Benighat.
Ghyालchोक Village Development Committee, Gorkha District
Salang Village Development Committee, Dhading District
Clean Energy, Prosperous Nepal
Budhigandaki Hydropower Company Limited